Bixby, Oklahoma · phased over multiple years

They did not have to do it all at once.

A staged rebuild across several years instead of one capital push.

New audio front end, stage lighting changes, and replacement of the cameras and projector.

The approach

Phasing works when somebody plans the whole path first.

New Beginnings rebuilt their systems in stages across several years rather than funding everything at once. We replaced the audio front end, changed the stage lighting, and replaced the video cameras and projector.

Done without a plan, phasing means buying things twice. Done properly, each phase is usable on its own, nothing gets stranded, and the order is chosen so that later phases plug into decisions already made. That requires the integrator to still be around in year three, which is the part that actually makes phasing possible.

Why this matters

Most churches cannot fund it in one year.

Infrastructure first

Pathways, power and structure get built once. Equipment fills in behind them as budget allows.

Each phase stands alone

Every stage has to be fully usable on its own. A half-finished system is worse than the old one.

Nothing bought twice

The whole path is planned before phase one is ordered, so later phases plug into earlier decisions instead of replacing them.

The same integrator throughout

Phasing across years only works if the people who made the plan are still there to execute it.

Scope

At a glance.

Total investment: approximately $75,000 to $100,000 across all phases
Scope: audio front end replacement, stage lighting, video cameras and projector replacement

Cannot fund it all at once?

Say so on the first call. We will plan the whole path and phase it.

Book a Free Consult See more work

Limitless AVL

Audio • Video • Lighting • Integration

★★★★★ 5.0 · 20+ Google reviews

Contact

(918) 526-3939info@limitlessavl.com8718 E 41st St, Tulsa, OK 74145

Follow us

Book a Free Consult

Book